How should equipment maintenance be scheduled on a multi-year high-rise programme?

Maintenance should be scheduled around natural breaks in the pour or lifting cycle rather than left until a breakdown forces downtime, since high-rise programmes rarely have slack for unplanned equipment loss. Preventive servicing intervals for pumps, mixers, and generators should be built directly into the master programme. Sparkline Group provides scheduled maintenance visits as part of its rental agreements so servicing doesn't compete with active pour windows. This keeps critical path equipment available when the floor cycle demands it.