What do UAE fire and safety codes require for welding operations on construction sites?

They require a formal permit-to-work process before hot work begins, a dedicated fire watch during and after the activity, and properly maintained welding equipment and PPE. The rules draw from the UAE Fire and Life Safety Code and civil defense guidance, which apply across all emirates with some local variation in enforcement detail. The goal is to prevent both immediate ignition and delayed fires from smoldering material after work stops. Sparkline Group supplies welding-related equipment used on many UAE sites operating under these procedures. Confirming your site's specific permit process before starting hot work is the essential first step.