What is involved in setting up a grouting pump on site?

Setup includes positioning the pump close to the mixing station to minimize hose runs, connecting power or fuel supply, priming the system with clean water to confirm valve operation, and checking pressure gauge accuracy before loading actual grout. Hose runs should be checked for kinks or excessive bends that could restrict flow or cause pressure spikes. A test run with water also confirms the agitator and hopper are functioning correctly. Sparkline Group assists with initial setup guidance when delivering rental grouting pumps to a project.